Hello,
I am considering the switch over to VT and I am getting a PC to test it out on, but will also be the main server on which it will run should I choose to do the switch.
I have always tried to purchase more than the minimum for the few SCADA servers I have setup. I want to do the same for this. However, its been a while since I have bought one and as I am building it the cost is getting on up there....
I have always gone with Xeon chips, ECC memory, SSD, etc.
If after testing, and all goes well, I'll be going with a Dual Server, so that will require me to have x2 whatever I go with.
We run just shy of 2000 external points, and I am not sure of the number of internal ones I would be using.
Typically, on any given day, there will be 3-4 people logged in using thin clients, but that could increase to 7-8 at a time.
I do want to use M.2 NVMe for storage, unless it is recommended to avoid that, because we do a lot of trending and historical lookup which really runs slow even on the SATA SSD I run in my current server.
I am just looking for opinions, what others have used, and what would be considered mid-class, not minimal. I have never had a server fail me yet, or lost any data by making sure it is well above what minimum specs are. In my early years I did loose some from trying to just get by.